New Facility Construction
Cambridge High School is a 320,885 SF, two-story high school featuring 99 instructional units. The project also includes an all-new athletic Football/Soccer Stadium, Baseball & Softball, Auxiliary and Competition Gymnasium. The 60-acre site is divided in half by an existing stream. The project also includes a pond with a replenishment well that feeds the athletic facilities’ irrigation system. The wetlands running through the school’s campus required creating a bridge that is as symbolic as it is physical. Just as the physical bridge unites this sprawling campus, it symbolically represents the bridging of the students and both Milton and Alpharetta too.
Georgia ACI Chapter of Excellence





